• NAME OF RESEARCH

    Feasibility Study of Khelvachauri II HEPP (Stage 3) in Georgia

  • NAME OF AUTHOR

    Fichtner

  • CATEGORY

    Energy

  • YEAR

    2012-10-13

  • Download PDF

The results of the study conducted by FICHTNER, for utilizing the potential energy between 31 m.a.s.l and 22 m.a.s.l elevations has been shared in this report. The Khelvachauri 2 (Stage 3) project is the most downstream part of a cascade system, consistent of 3 run-of-river type HEPPs including weir and power house structures which are directly located at the tails of the weirs.

The Project has been developed to generate electricity on Chorokhi River stretch between the Turkish border and the Black Sea in Georgian Batumi Province.