• NAME OF RESEARCH

    ENGURI 4 HPP PRE-FEASIBILITY STUDY

  • NAME OF AUTHOR

    Deloitte Consulting

  • CATEGORY

    Energy

  • YEAR

    2012-06-10

  • Download PDF

The Enguri 4 HPP site is located along the Enguri River between the Ipari and KalaCommunities, located about 8 km (straight line) southwards from the developed area of Mestia district of northern Georgia’s Samegrelo-Upper (Zemo) Svaneti Region. The Enguri River in this area has a moderate slope, providing a very good opportunity to develop a project that is expected to be financially attractive.

Pre-feasibility studies include following topics: Project area social characteristics, baseline conditions, geology  hydropower project description, power and energy studies , project cost estimation and constrution schedule.