• NAME OF RESEARCH

    ENGURI 3 HPP PRE-FEASIBILITY STUDY

  • NAME OF AUTHOR

    Deloitte Consulting

  • CATEGORY

    Energy

  • YEAR

    2012-08-08

  • Download PDF

The Enguri 3 HPP is located on a right bank of the Enguri River, with power plant located 4 km downstream from the Vichnashi Village. The rivers in this area are steep, providing a very good opportunity to develop a project that is expected to be financially attractive.

Pre-feasibility studies include following topics; Geology, hydropower project description, power and energy studies , project cost estimation and constrution schedule.