• NAME OF RESEARCH

    ENGURI 2 HPP PRE-FEASIBILITY STUDY

  • NAME OF AUTHOR

    Deloitte Consulting

  • CATEGORY

    Energy

  • YEAR

    2012-09-04

  • Download PDF

The Enguri 2 HPP is located on the Enguri River and a right-bank tributary, with the power plant located near the confluence in Lalkhori Village, Kala Community. The rivers in this area are steep, providing a very good opportunity to develop a project that is expected to be financially attractive. 

The preliminary project layout, based on information available at this time, includes two low diversion dams with sluices and intakes, two de-silting facilities, tunnel water conductors, pressure tank, penstock, and a surface powerhouse

While considering the Pre-Feasibility Study, each recipient/interested party should make its own independent assessment and seek its own professional, financial, legal and tax advice.