• NAME OF RESEARCH

    ENGURI 1 HPP PRE-FEASIBILITY STUDY

  • NAME OF AUTHOR

    Deloitte Consulting

  • CATEGORY

    Energy

  • YEAR

    2012-09-20

  • Download PDF

The Enguri 1 HPP is located on the Enguri River and a left-bank tributary, with the power plant located just downstream from the developed area of Ushguli. The rivers in this area are steep, providing a very good opportunity to develop a project that is expected to be financially attractive. 

The preliminary project layout, based on information available at this time, includes two low diversion dams with sluices and intakes, two de-silting facilities, a free-flow tunnel, penstock, and a surface powerhouse